New Mexico Maintenance Bond

New Mexico's public works bonding statute (NMSA § 13-4-18) requires only performance and payment bonds for contracts over $25,000; it does not mandate a separate maintenance or warranty bond. NMDOT Standard Specifications (sections 103.6 and 106.10) may require a warranty bond tied to specific highway bid items, but that requirement is imposed by contract, not statute. The $10,000 contractor license bond (NMSA § 60-13-49; 14.6.3 NMAC) covers certified code violations for up to two years after final inspection but is a license bond, not a standalone maintenance bond.

Bond at a glance
New Mexico Maintenance BondContract bond
Set by the contract
LawNMSA 1978, § 13-4-18 (requires only performance and payment bonds; no maintenance bond); NMDOT Standard Specs §§ 103.6, 106.10 (warranty bond by contract for specific bid items)
AmountNo statutory amount; NMDOT contract warranty bond amount tied to specific bid item price
Required byProject owners and NMDOT by contract; not required by New Mexico statute
How it works

Three steps to your bond.

  1. 01Apply onceTell us about your business and what the bond is for. One application covers most contractor bonds.
  2. 02The surety reviews itPropeller Bonds, our surety partner, reviews your application and sets the terms. We show you the terms before you commit.
  3. 03Sign and fileSign the bond and file it with whoever requires it: the project owner, agency or court. We help with the filing.
About this bond

What a maintenance bond is

A maintenance bond, also called a warranty bond, guarantees your finished work is free of defects in materials and workmanship for a set period, often one or two years. Sometimes it's built into the performance bond; sometimes the owner wants it separately.

In New Mexico

New Mexico's public works bonding statute (NMSA § 13-4-18) requires only performance and payment bonds for contracts over $25,000; it does not mandate a separate maintenance or warranty bond. NMDOT Standard Specifications (sections 103.6 and 106.10) may require a warranty bond tied to specific highway bid items, but that requirement is imposed by contract, not statute. The $10,000 contractor license bond (NMSA § 60-13-49; 14.6.3 NMAC) covers certified code violations for up to two years after final inspection but is a license bond, not a standalone maintenance bond.

  • The $10,000 contractor license bond under NMSA § 60-13-49 / 14.6.3 NMAC covers code violations within two years of final inspection but is not classified as a maintenance bond.

You need this bond if you're

  • A contractor finishing public works with a warranty period
  • A site contractor handing improvements over to a city or county
  • Paving, concrete, roofing and landscaping contractors
  • A developer whose subdivision bond is being released

What the surety looks at

Your business, credit and the finished project. Often handled together with the performance bond.

FAQs

Common questions.

Does New Mexico law require maintenance bonds?

Usually the contract or the local agency sets it, not a statewide law. The contract states the amount and how long it lasts.

How long does a maintenance bond last?

As long as the warranty period in the contract, commonly one or two years after the owner accepts the work.

What does it cost?

You pay a premium, not the bond amount. The surety sets the premium after it reviews your application, usually as a percentage of the bond amount. We show you the terms before you commit.

How do I get one through BLDAssure?

Apply once with us. We collect the details the surety needs, Propeller Bonds (our surety partner) reviews the application and issues the bond, and we help you file it with whoever requires it.

Related bonds

Other New Mexico bonds.

See all 22 New Mexico bonds with prices →

Contract bond

New Mexico Performance & Payment Bond

Performance and payment bonds usually come as a pair once you win a job.

Development bond

New Mexico Subdivision Bond

Cities and counties often require a developer to bond the public improvements in a new subdivision or site plan, like streets, sidewalks, storm drains, sewer and water lines, before they approve the final map or permits.

Contract bond

New Mexico Bid Bond

A bid bond is a guarantee you submit with your bid.

Sources

  1. NMSA 1978, § 13-4-18 – Construction contract performance and payment bonds
  2. NMDOT Plans, Specifications & Estimates – Standard Specifications (2019)
  3. 14.6.3 NMAC – Contractor licensing and $10,000 bond requirements

General information, not legal advice. Rules change; confirm the current requirement with the agency or owner that asks for the bond. Facts checked Oct 23, 2026.

Get prequalified for your next bond.

One application, reviewed by our surety partner Propeller. We show you the terms before you commit.

Get started

Tell us who you are and we'll set up your account.

Book a demo

Step 1 of 3

See the platform with your own market, projects and vendors.

What you need

Interested in (pick any)